In this fictional job, a receiving clerk records Coil A at 10.000 t. That entry gives the planner a particular coil to select for work. Days later, accounts uses a weight measured at dispatch to prepare the service bill. If the customer asks which coil their sheets came from, the answer still leads back to that first receipt.
The planner can use the weight the receiving clerk recorded. Dispatch will need a fresh reading when the bundles leave. What can the next person rely on, and what do they need to record for themselves?
What the planner can reserve
When the planner selects Coil A for slitting, the receipt identifies the coil and gives its recorded weight. For this newly received coil, the planner uses the width stated on the supplier’s paperwork or purchase order. How much steel can this job claim? That depends on where the coil is now, whether it is eligible for slitting, and how much has already been reserved.
Slitting turns Coil A into Coil B at 6.000 t, Coil C at 3.700 t, and 0.300 t of trim. Each output has its own stock record linked to the slitting result. A planner can now reserve Coil B without making a claim on Coil C. Someone tracing either coil can follow the slitting record back to Coil A and its receipt.
What the plan tells the operator, and what the operator records
The released plan tells the operator which coil to load, which line to use, and which strips to cut. During setup at the slitting line, the operator measures the full width of Coil A and records it in the application. Floor staff then use a printed quality sheet to record the strip widths they measure on the first metre of the cut.
Coil A’s cut went to plan. The result form already includes the edge trim, and the operator confirms its 0.300 t net weight. Suppose another run produces unexpected scrap. The operator selects Changed from plan, records the scrap, and confirms how much trim remains on each edge. Those entries replace the planned trim rows so the same steel is counted only once. The supervisor can see what changed and review the result before the new coils are posted to stock.
If the entered output weights add up to more than the source coil’s weight, the operator sees an error. The planner still sees the original coil in stock, and there are no new coils to label.
| Who picks up the work | What they can rely on | What they record |
|---|---|---|
| Planner | An identified coil, its width reference for planning, and the quantity available | The selected coil, process, line, and intended outputs |
| Operator | The released plan and the coil assigned to it | The coil width measured at setup, the pieces produced and their weights, and any changes to trim or scrap |
| Supervisor | The plan and the operator’s proposed result | The review decision and the reason for it |
| Dispatch clerk | Released bundles and the site holding them | Which bundles shipped and their delivery readings |
| Accounts clerk | The completed shipment and its service details | The expected charge and any difference in the accounting return |
At dispatch, the clerk can look up the bundle weight the operator recorded and enter a fresh reading for the delivery. Accounts can then use that reading and follow the bundle back to production if a question comes up.
A change of site makes authority visible
Coil B can be assigned to the partner before the truck arrives. The assignment tells the partner operator which work to expect. The transfer receipt establishes that the coil has reached their site. That lets the partner prepare for an incoming job and record production once the assigned coil is eligible for the cut.
The same distinction matters after cutting. The partner operator records the bundles they produced. The primary processor controls the customer shipment, even when the truck collects those bundles at the partner site. The accounts clerk can pick up the completed delivery under the primary processor’s authority.
Suppose someone spots an error in the slitting record after the partner has used Coil B. Editing the old weight in place would change the evidence that the partner acted on. A proposed correction or reversal has to reference the original posting and account for the steel already used. A later reader can then see the measurements the partner received and what was subsequently corrected.
Write the test at the point where work can go wrong
“The planner can save a plan” would pass even in a system that let two people promise the same steel. A more useful test follows both planners through the competing claims and checks what each sees on screen against the stock records.
Start with all 6.000 t of Coil B available. Two planners open the same stock view. Each tries to reserve the whole coil for a different job, and their requests overlap. Once both requests finish, there must be exactly one reservation for 6.000 t. One planner has the reservation. The other sees a conflict, and their attempt leaves no reservation behind. Checking the records as well as the screen catches a failure that an error message alone could hide.
The same question gives the client concrete checks at other handoffs.
- After a split, can the planner trace Coil B, Coil C, and the trim to the accepted slitting result and the same source coil?
- At the partner site, can the operator record work on the assigned coil while unrelated material stays outside their worklist and their authority?
- If the accounting return differs from the expected charge, can the accounts clerk see both amounts against the delivery and investigate the difference?
Follow the receipt far enough to know where to stop
For this client, the application carries the completed shipment as far as billing preparation and reconciliation. The existing accounting system receives the export. Its return can be matched to that export, giving accounts a specific transaction to check. The original coil is still traceable if the customer asks about the steel behind the bill.
That trace depends on an earlier moment at the slitting line. The operator submits the result for Coil A, and the connection drops before the reply arrives. The two new coils are on the floor. Did the application post them to stock, and how can the operator find out before trying again? That’s where the next chapter begins.