A customer orders narrow sheets. In this fictional order, the primary site has the right steel in Coil A, but the coil is too wide. The planner sends it to the slitting line first. One of the narrower coils, Coil B, will go to the partner to be cut into sheets. Coil C, the other usable coil from the cut, stays at the primary site.

The slitting operator needs a strip layout. The operator cutting Coil B into sheets needs the cut length and bundle counts. Each gets instructions for their own line, and both record their output in the same stock ledger. The warehouse can then trace a finished piece back through both jobs to the coil that supplied it.

What does the customer want from the coil?

Process What the customer needs What the operator records
Cut-to-length Sheets cut across a coil at its existing width The bundles produced, their lengths, sheet counts, and net weights
Slitting Narrower strips wound back into coils The confirmed slit order, the coil parts produced, their net weights, and any trim or scrap
Rewinding Usable coil parts at the existing width Which parts came off the line and the net weight of each
Narrow cut-to-length Sheets cut from eligible narrow coils Each bundle’s sheet count and net weight, with its dimensions tied to the job

For an order at the coil’s existing width, the planner can send eligible stock straight to cut-to-length. Slitting is a separate decision. If an order calls for an even narrower strip, an eligible slit coil can go back to the slitting line.

Who sets the slit order?

For Coil A, the planner specifies the strip widths, the number of strips at each width, and one parts-per-strip count for the whole cut. Two strips of the same width occupy two positions across the coil. If the plan calls for two parts per strip, each strip is wound into two successive coils.

Printing the plan releases those instructions. At setup, the slitting operator confirms the left-to-right order of the strips before requesting the production quality control (QC) sheet. The floor crew uses the printed sheet to record the widths they measure on the first metre. The application keeps the link from each coil produced to its slit position and part number.

Rewinding skips the production QC step. Suppose a 5.000 t coil yields two rewound parts. The operator records 2.500 t for one and 1.500 t for the other. The application derives the 1.000 t left unprocessed and gives that remainder its own stock identity. A planner can tell it apart from the two parts the operator actually made.

When one bundle becomes two

On a cut-to-length job, the plan calls for one bundle of 160 sheets. The operator cuts all 160 sheets to length, but they come off the line in two bundles of 100 and 60. The operator records the count and net weight of each against the same plan instruction. The change in bundle count sends the result to review. On approval, both bundles enter stock under their own identities, and the original instruction still shows what the planner ordered.

A warehouse operator can also split a bundle after production. During dispatch preparation for a different order, the operator takes a whole, released cut-to-length bundle of 40 sheets and divides it into 24 and 16. The application checks that the two new bundles account for all 40 sheets and that their recorded net weights add up to the original bundle’s weight. They take its place in available stock. The production record still shows that the line made one 40-sheet bundle.

When can a result go to review?

Saving an eligible draft plan reserves its planned net weight on the selected coil. Other jobs can reserve some of the same coil, and each job keeps its own claim. That matters when the line processes more steel than the planner expected.

In a cut-to-length test, the plan reserves 4.000 t on a 10.000 t coil. The operator records 4.100 t of output. The extra 0.100 t is available, so the application sends the result to review. The test checks the ledger before and after approval. While the result is pending, there is no stock posting. After approval, the ledger shows 4.100 t of finished stock and 5.900 t left on the coil under a new identity.

A job can use only its own reservation and any steel still unreserved. If the operator enters outputs heavier than the entire source coil, the application rejects the submission immediately. A second test checks that the failed attempt leaves the stock and its history intact.

Coil B goes to the partner

For this order, the primary processor has Planned production enabled for partner work. The planner selects the released 6.000 t Coil B for a narrow cut-to-length job at the partner site. The application also supports Direct transfer, the default for partner work. On that route, the partner records the bundles actually produced without a production plan or printed production QC sheet.

On Coil B’s planned route, the partner receives the coil and uses the printed QC sheet on the floor. The operator records Bundle D and Bundle E, each with 40 sheets and a net weight of 2.900 t, then enters 0.200 t of scrap under Trim/Scrap. All 6.000 t are accounted for. Recording the scrap sends the result to the primary processor for review. Once the reviewer approves it, the two bundles enter stock at the partner site. Who can release them to the customer when the steel is still at the partner’s warehouse?

Previous — Stock You Can Reconcile and Material You Can Trace · Series index · Next — Keeping Custody Intact Across a Partner Site

Discussion

Comments 0

New comments are moderated before they appear publicly.

Be the first to leave a thoughtful comment.