The truck carrying Coil B has left the primary site. The planner can see its 6.000 t in transit. At the partner site, the operator can already open the assignment and see which coil to expect.

When the truck arrives, the partner operator selects Receive consignment. Back at the primary site, the planner can see that the partner has the steel. The coil was already spoken for before it left the floor.

The coil can be committed while it is still on the floor

Coil B and Coil C came from the same customer receipt. When the planner saved the production plan for the partner’s narrow cut-to-length job, they selected Coil B and reserved its 6.000 t. The warehouse could still find both coils on the primary site’s floor, and the planner could see which one to send.

Two desks, one movement history

The primary processor groups the jobs travelling together on a transfer delivery challan (DC). The same document lets the dispatch clerk record what left and the partner operator confirm what arrived. The customer owns the steel throughout.

Action Where is Coil B? What can the next person see?
Save the production plan Primary site Coil B is reserved for the partner job.
Prepare the transfer challan Primary site The dispatch clerk can see which coils and jobs are on this load.
Select Print and dispatch entire DC In transit The partner sees an incoming consignment and can check which coils to expect.
Select Receive consignment on arrival Partner site The planner can see that the partner has received the whole load.

Opening the assignment lets the partner check the instructions for Coil B before the truck arrives. Those instructions stay with this job even if the primary processor changes how it sets up later work. The operator records receipt when the steel is there. If several jobs travelled on one challan, that single receipt covers them all.

The bundles stay with the partner until shipment

Once the primary processor approves the partner’s cut, Bundles D and E enter stock at the partner warehouse. Who can arrange collection? The primary processor’s dispatch clerk reserves the bundles for the customer. The partner warehouse can then stage them for the truck. The first verified print of the customer delivery challan records both bundles leaving partner custody.

A cancelled job can still be on a truck

Suppose the planner cancels the cutting job after Coil B leaves the primary site. The cut is off, but the truck is still on its way. When it arrives, the partner operator receives the consignment as usual. The planner now sees a cancelled job and 6.000 t of the customer’s steel at the partner warehouse.

If the customer gives new cutting instructions, an authorized planner at the primary site can book replacement work against Coil B where it sits. The partner operator sees the new instructions. Both teams can refer to the receipt from the truck that actually brought the coil.

Previous — Choosing the Right Process for a Coil · Series index · Next — Designing for the Person Doing the Work

Discussion

Comments 0

New comments are moderated before they appear publicly.

Be the first to leave a thoughtful comment.